×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

3 phase horizontal separation vessel design

3 phase horizontal separation vessel design

3 phase horizontal separation vessel design

(OP)
Hi,

1. When you have a weir inside the vessel, does the height of it usually be the same as the normal interface level? or in some cases it might be higher than the NIL ?

2. Is there like a rule of thumb on how you determine the position of the weir along the vessel shell length ?

3. is there also a rule of thumb on determining all the levels (LIL,NIL,HIL, LLL, NLL, HLL) inside a vessel for both light and heavy phases?


Thank you

RE: 3 phase horizontal separation vessel design

The weir plate may generate a confined space and difficult the access for inspection. Hence one more inspection opening is required. This opening may be installed on the weir plate.

Regards

RE: 3 phase horizontal separation vessel design

IMO, all these levels of the vessel are determined from the pilot study and based on the certain process conditions, such as flow, P&T, liquid property, etc. And, the weir height may be covered above HIL per the process needed.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - How to Capitalize on HVAC/R Trends to Drive Business Growth
According to Steve Yurek, CEO of the Air Conditioning, Heating and Refrigeration Institute, the HVAC/R industry is facing change on all fronts. This includes challenging trends on contractors and distributors like new refrigerants, growing automation, complex sensors and monitoring, green initiatives and a technician shortage. We look at these trends and outline actionable insights on how it all can be turned into a competitive advantage and business opportunity. Download Now
eBook - Manufacturing the Cars of Tomorrow
In this ebook, we'll explore how additive manufacturing is going to transform the way cars are made. This includes commentary from thought leaders such as Ford's CTO, Ken Washington, Customer case studies of ways 3D printing is being used today, and a variety of part examples where 3D printing is already impacting how automobiles are made. Download Now
White Paper - Smart Manufacturing for Semiconductor
New technologies and approaches present great opportunities for semiconductor manufacturers to achieve high levels of innovation, yield and improvement. This white paper explores some of these cutting-edge technologies and how they can be applied effectively in the semiconductor industry. Read about how Smart Manufacturing is transforming the semiconductor industry. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close