INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Pavement planing asphalt overlay with chip seal base

Pavement planing asphalt overlay with chip seal base

Pavement planing asphalt overlay with chip seal base

(OP)
I am working on a pavement rehab project, that we will be pavement planing the asphalt to a certain depth (prefer 3" th) and placing an asphalt overlay (3"). We have received cores and have found that there is a chip seal base where some locations of the asphalt overlay is only 1-1/4" thick, other locations it is thicker. Does anyone know if planing machines have issues milling the chip seal, due to the amount of binder? And if it does not have a problem with milling it, does it however, damage the remaining chip seal base? Thanks
Replies continue below

Recommended for you

RE: Pavement planing asphalt overlay with chip seal base

Some raveling of the chip seal should be expected, but it will likely be isolated. I would not abandon a milling project because of a chip seal.

If you are significantly concerned, reduce the depth of milling to leave some existing asphalt surfacing.

RE: Pavement planing asphalt overlay with chip seal base

(OP)
Thank you. With the cores varying throughout, I'll probably just mill the full 3 inches and put some repair quantities in the plans. FYI-The road is about 2 miles long and with 18 cores,10 showed an overlay thickness of 1.25" to 2.75" (avg of 2 inches), the remaining cores were over 3 inches of overlay.

RE: Pavement planing asphalt overlay with chip seal base

How thick is the total pavement section including the chip seal(s)? Maybe cold in place recycling or full depth reclamation would be better options. They will raise the profile, though, which a mill-and-fill won't.

My glass has a v/c ratio of 0.5

Maybe the tyranny of Murphy is the penalty for hubris. - http://xkcd.com/319/

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close