INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

NU girders, debonding outside of top flange

NU girders, debonding outside of top flange

NU girders, debonding outside of top flange

(OP)
I was talking with a coworker in another office this morning. He is designing a new bridge with NU girders and was reviewing the state DOT's design requirements.

One of them was placing felt paper on the outside 9" of each side of the top flange.

This bridge is off system and tge DOT has no jurisdiction so he isn't going to follow it.

Anyone have any idea what purpose the debonding serves?

RE: NU girders, debonding outside of top flange

Got a drawing or picture?

Trying to get slab reaction centrally over the web of the girder?

RE: NU girders, debonding outside of top flange

I would guess that the DOT has had issues with allowing the edges of the flange to bond with the slab. Perhaps the difference in the modulus of elasticity between the slab and girders is enough to cause spalling. I suggest contacting someone at the DOT familiar with the design of that type of bridge, and ask them. There are some things we do at the DOT just because 'we've always done it that way', but the NU girders are a fairly recent invention, so the detail is likely addressing an issue that's come up.

Rod Smith, P.E.

RE: NU girders, debonding outside of top flange

(OP)
Replacing the deck on PC Beams is wrought with problems. Contractors I know say it's often cheaper to replace the beams due to the labor costs of a bunch of guys with "rivet busters" doing the final concrete removal around the shear connectors while trying to avoid damaging the beams.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

eBook - The Future of Product Development is Here
Looking to make the design and manufacturing of your products more agile? For engineering and manufacturing organizations, the need for digital transformation of product development processes just became more urgent than ever so we wanted to share an eBook that will help you build a practical roadmap for your journey. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close