INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Hydraulic calculation using the Rational method

Hydraulic calculation using the Rational method

Hydraulic calculation using the Rational method

(OP)
When performing a hydraulic calculation using a rational method, the following question arises: How much can Qfull and Qdes differ?
For correct hydraulic calculation, it is necessary that the Vfull≥Vmin. if this condition is not met, how to adjust the slope. Is there any table of normative slopes, or I substitute any numbers?
Does Vfull have to constantly increase?

RE: Hydraulic calculation using the Rational method

if I get your question, you are asking how close should your design be to the full capacity of the channel?
So if your Qfull is 100cfs, how close should your design be?
Well, that depends on your local or design requirement. I usually keep my design 80% of Qfull.
For velocities, that depends on the type of channel it is (grass channel, stone, concrete channel...etc). Each type of channel have maximum allowable velocity. For grass channel, its around 3.5 feet per second (fps), for stone/rock channel it can be be upwards of 15-fps.
IF the channel cross section is set, you can adjust the slope of the channel to get the velocities you want. There is no "normative slope" per say, but there is "normative velocity" . Whatever slope gives you the velocity (or sheer stress) you need for the type of channel you are designing, is what you go with.
To find what these "normative velocity" or what i called "allowable velocity" just google it.

Here is another link: https://www.roads.maryland.gov/OHD2/Highway_Draina...
see table on page 86.

I hope this answered some of your questions and didn't confuse you more.

RE: Hydraulic calculation using the Rational method

To build on what was already mentioned above, key items for design of an open channel are typically based on the governing agency's design criteria. This can include:
- Freeboard - Dictates the % full. Freeboard varies with velocity, flow regime etc...
- Velocity / Stable Channel Design
- Channel Material Types, what is acceptable versus not. If you are designing an earthen or lined channel etc... Also, will the end of the channel require energy dissipation?
The design element is driven by design criteria and policy. Make sure that you are familiar with these and meet the minimum criteria and your design should be approved.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close