×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

base scope for a new building- what do you include

base scope for a new building- what do you include

base scope for a new building- what do you include

(OP)
We are having a discussion in the office about what should be included in typical base scope structural engineering services for a new building. For example historically we have not included in our proposals the design or detailing of interior partitions, typical stairs, handrails, or typical mechanical equipment supports. We expect a third party stair engineer, architect, mechanical engineer to design these items, perhaps with some input from us in CD phase but in the end not to be shown on our drawings. These things are not considered part of the "basic building structure". Was wondering what others are doing or being asked to do these days. Our area of practice is NE United states.

Thanks

RE: base scope for a new building- what do you include

I think that the things you've mentioned should be left out of your scope, unless they're specifically being asked for by the client. It's hard to stay competitive when you're including work that's not generally expected. Heck, in the NE US connections are a delegated design, but that's worthy of a separate discussion.

It's also important to try to anticipate and discuss things that may not be shown on early architectural drawings: canopies, atrium facade framing, mechanical screens. These can take as much time to design and detail as the entire building frame.

RE: base scope for a new building- what do you include

I do it different than some in my area but in general, here is what I do. I have found not specifically listing what you are NOT doing can create problems later.

I list out my general scope of work such as:

The following items are included in the base scope of work:
  • Primary Structural Steel Frame
  • Foundations for Primary Structural Steel Frame
  • Wood Wall Framing
  • Floor Framing

I then list SOME of the items I am specifically NOT designing but could if paid.

This proposal specifically does not include the following items that can be provided at an additional fee:
  • Stairways of any kind
  • Slab on grade concrete steps
  • Canopies
  • Items appearing on the project drawings but not specifically listed in the scope of work above

Sometime I will list engineering items I cannot supply if I wanted to when the client does not understand that all engineers do not do the same type of work.

The following services are not supplied and cannot be supplied by <insert name> at an additional fee:
  • Soil Testing
  • Architectural Services
  • Mechanical, Electrical and HVAC


RE: base scope for a new building- what do you include

We have an ongoing battle to try and leave out all miscellaneous metal out of our scope. Aside from stairs and handrails, other examples that are often contentious are:
Small piece of metal, M&E equipment support, metal to hang a washroom partition, ladders in m&e rooms, between different roof heights etc.,
Maybe we should brainstorm a list here on eng-tip; we can almost be like a union collective bargaining.

RE: base scope for a new building- what do you include

Wasn't there a document that outlined what is generally included in the structural engineer's fee? Seems I saw one years ago. I know it did not include a lot of the items we are listing as not in our scope.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - Design for Additive Manufacturing
With a growing number of parts manufactured directly by additive manufacturing techniques, it is important to lay down design principles suitable for such manufacturing processes and to ensure parts are designed for additive manufacturing. There are several factors that are to be considered at the design stage. Few such design issues in additive manufacturing are discussed in this paper. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close