INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

field density test ( sand cone test)

field density test ( sand cone test)

field density test ( sand cone test)

(OP)
How can i apply sand cone test on inclinometers(high slope) layers ( base course, sub base, ...)?Is this test accurate? or i have to make another tests?

RE: field density test ( sand cone test)

Why can't you cut a little shelf to allow the plate to sit horizontally?

RE: field density test ( sand cone test)

(OP)
We can’t do this, because we need the full depth .

RE: field density test ( sand cone test)

(OP)
When we put the plate on the layer surface and open the cone, the sand will fall with gravity but not vertically on the layer.

That’s mean there is a space on the top will be empty of sand. In this case the results will not be accurate.

RE: field density test ( sand cone test)

Are you compacting in horizontal layers or in inclined layers? I do not see the issue IF this is for granular pavement course. Max crossfall usually not more than 2%. I think that you are worrying too much "theoretically". Your compacted layers will not be 100% uniform in thickness. Secondly, sand cones would not "extend 250 to 300 mm. For me, I would just do a simple "normal" depth sand cone and get the results. If you are really worried, then scrape off a 100 mm or so and do another sand cone. If the material placed is a medium sand, say (river sand), then as a matter of course, you should scrape 100 mm or so below the surface and then do the sand cone. Due to traction, etc. the top, say 50 mm or so, might not be compacted to the same level. For sands, I like, if possible, to do the density tests on the previous layer.

RE: field density test ( sand cone test)

If the slope is still under construction, I would ask some excavator operator to make a trench for you make the sand come test.

RE: field density test ( sand cone test)

As mentioned by BigH the compaction is usually completed in horizontal lifts with overbuilt portions removed after compaction. This allows for sand cone or nuclear densometer testing to confirm the material meets its proctor specification.

Construction which uses a hoe mounted tamper or bucket compaction for steeper slopes are for areas which typically do not require meeting a specific proctor value.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

eBook - Mastering Tolerances for Machined Parts
When making CNC machined parts, mastering tolerances can be challenging. Are general tolerances good enough? When does it make sense to call out for tighter tolerances? Do you need a better understanding of fits, datums, or GD&T? Learn about these topics and more in Xometry's new e-book. Download Now
eBook – How to Choose the Correct Corrosion Testing Method
When designing a metal component, engineers have to consider how susceptible certain alloys are to corrosion in the final product’s operating environment. In a recent study by NACE (National Association of Corrosion Engineers), it was estimated that the direct and indirect costs of corrosion in the United States is approximately 6.2% of the GDP. In 2016, that cost exceeded $1 trillion dollars for the first time. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close