INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Micropile Connection for Fixity

Micropile Connection for Fixity

Micropile Connection for Fixity

(OP)
FHWA gives guidance of a micropile attaining full head fixity at 24" of embedment. With a top plate attached and threaded bar/nut/ embedded into the pile, could the connection not be designed for fixity with a lesser pile cap embedment? Basically check that breakout on the bottom side of the plate/cap is sufficient to withstand the applied moment? Love to hear some thoughts.

RE: Micropile Connection for Fixity

Presumably, if the pile has a fixed connection to an adequately stiff embed that develops the full moment capacity of the pile through the connection and into the concrete, then it's essentially fixed.

I'm a bit surprised at how much embedment they're calling for. TXDOT did some full-scale testing of H-piles (HP12X53) embedded in a concrete abutment cap and the piles hinged (developed the full plastic moment capacity), without breaking out if the concrete, with 12" of embedment.

RE: Micropile Connection for Fixity

(OP)
I agree. Another DOT ( I think Oregon) did one with micropiles and the deflections even at 6" embedment mimicked the expected fixed head deflections. Often times when dealing with piles in either a grade beam setting or diaphragm, it is not feasible to get that kind of embedment but it is desirable to have the deflections calculated as fixed head rather than pinned.

RE: Micropile Connection for Fixity

I think you might have that turned around, jwatso33. For a conservative design, I would calculate deflections using the pinned assumption, which would be the most flexible, and design for strength using the fixed head assumption, which would max out the moments.

RE: Micropile Connection for Fixity

(OP)
For a conservative design I agree...but that is not always the case. Where trying to limit deflections, often the most economical method designing a fixed head connection even when it requires more embedment. From there you just have to deal with the moments with casing size/reinforcement. That is why I am curious about what connection could get that kind of result without such a great embedment into the cap.

RE: Micropile Connection for Fixity

I apparently misunderstood your statement, jwatso33. I agree that with adequate embedment (or other restraint), modeling the pile head as fixed is a reasonable assumption. Of course nothing is truly fully fixed, but you can get pretty close to it with direct embedment or a stout connection plate and anchors.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

eBook - 10 Reasons to Choose CATIA on the Cloud
To compete in today’s fast-paced and competitive market, smaller and newer firms need a powerful platform that will enable them to compete with bigger players, without the heavy investments needed in computer hardware, software and personnel. Download Now
White Paper - Smart Manufacturing for Electronics
This white paper describes a transformative approach to electronics manufacturing made possible by the addition of Mentor Graphics to the Siemens family. It describes a completely digitalized strategy that supports both printed circuit board (PCB) and mechanical design and manufacturing, uniting the entire product lifecycle – from idea and production to customers and back. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close