INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

drilling thru earth retention pond dike

drilling thru earth retention pond dike

drilling thru earth retention pond dike

(OP)
Inside our plant we have decades old, man-made lakes/retention ponds for firewater and all other water needs.
Dike around the ponds is made of soil and small crushed rock on the surface.
We have a project where new above ground pipes will be running along the side of the dike.
We'll put it as close to the edge of dike crown and sloping portion.

My question is about the foundation which will be helical/screw piles and geotech soil boring.
These ponds have clay liners and I'm not sure of potential breach of the dike/pond.
Contractor plan on drilling up to 50' for soil boring.
The helical piles will probably just be 30' max and 2' dia.

RE: drilling thru earth retention pond dike

If you use casing for the pile installations,likely no problem. Less of a problem potential if ponds are dry at the time.

RE: drilling thru earth retention pond dike

in general, installing pipelines on top of a dam and drilling holes through the dam are not recommended due to potential failure modes resulting in leakage or breach

RE: drilling thru earth retention pond dike

A sketch would be useful.; is this a typical liner against the inside face of the dyke or is it a standard type clay core in the dyke (as for a zoned earth dam)? For water retaining dams, as cvg indicated, drilling is not recommended into the clay; from my understanding of the USBR latest manuals, only auger or sonic drilling is to be permitted into the clay core. In your case if this is a thin layer clayey inside surfacing, actually drilling into the liner may not be necessary (why a sketch would be helpful) - but in any case, I would suggest that any drilling be limited to auger or sonic.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

Ebook - Mastering Tolerances for Machined Parts
When making CNC machined parts, mastering tolerances can be challenging. Are general tolerances good enough? When does it make sense to call out for tighter tolerances? Do you need a better understanding of fits, datums, or GD&T? Learn about these topics and more in Xometry's new e-book. Download Now
eBook – How to Choose the Correct Corrosion Testing Method
When designing a metal component, engineers have to consider how susceptible certain alloys are to corrosion in the final product’s operating environment. In a recent study by NACE (National Association of Corrosion Engineers), it was estimated that the direct and indirect costs of corrosion in the United States is approximately 6.2% of the GDP. In 2016, that cost exceeded $1 trillion dollars for the first time. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close