INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Overland Flow Requirement for subdivisions

Overland Flow Requirement for subdivisions

Overland Flow Requirement for subdivisions

(OP)
To whom it may concern,

What is overland flow requirements for new deveopments?

The standard specifications for a city in California require an overland flow requirement when designing grading and storm water requirements for new developments such as subdivisions. Is overland flow requirement the requirement that flooding of house pads won't occure until there is a release point for flood waters to leave the area on top of the ground via streets or some other lower channel?


Thanks,
Civil G

RE: Overland Flow Requirement for subdivisions

This will vary by municipality, but you have the gist of it. It's typically going to say for XX 24 hour storm event that overland flow must be contained within the cartway, or a minimum 1' below the first floor elevation, or something else similar.

RE: Overland Flow Requirement for subdivisions

Municipalities have different specifications for storm size to road traffic size. Cul de sacs not as important as main roads.

Overland flow directs water to the perimeter lot swales then to the road and then to the storm sewer. Requirements come in on how far the nearest storm sewer and spacing between catch basins.

RE: Overland Flow Requirement for subdivisions

In this area of the country, an overland flow requirement would mean basically "You can't connect your gutter downspouts directly to the storm drain. We want it to flow over the grass first."

Hydrology, Drainage Analysis, Flood Studies, and Complex Stormwater Litigation for Atlanta and the South East - http://www.campbellcivil.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

eBook - Mastering Tolerances for Machined Parts
When making CNC machined parts, mastering tolerances can be challenging. Are general tolerances good enough? When does it make sense to call out for tighter tolerances? Do you need a better understanding of fits, datums, or GD&T? Learn about these topics and more in Xometry's new e-book. Download Now
eBook – How to Choose the Correct Corrosion Testing Method
When designing a metal component, engineers have to consider how susceptible certain alloys are to corrosion in the final product’s operating environment. In a recent study by NACE (National Association of Corrosion Engineers), it was estimated that the direct and indirect costs of corrosion in the United States is approximately 6.2% of the GDP. In 2016, that cost exceeded $1 trillion dollars for the first time. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close