INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Lateral Pile capacity in Rock

Lateral Pile capacity in Rock

Lateral Pile capacity in Rock

(OP)
It is a bridge to be constructed in creek portion near sea in India. The fluctuation of water is there due to tidal variation. The bridge is a balanced cantilever.
Vertical load 1250t.
Lateral load 200t.
About the strata :
thin layer of soft marine clay
completely to highly weathered rock around 7 to 8m in center as it is varying along the length.(like while drilling the pieces i can break in hand like biscuit)
then moderately weathered rock followed by fresh basalt rock below.
Socketed to fresh rock up to 4D. (Dia = 1.5m)

So i am trying to calculate the lateral capacity of pile.
So, any suggestions for shear criteria and deflection criteria to get the lateral pile capacity.
Tried BROMS method but the variation from completely weathered to moderately is very high so couldn't take average.
Tried with P-y curves but i am thinking the models are not suitable for the strata.
Please tell any other methods which you have used in your practice.
Thank you.

RE: Lateral Pile capacity in Rock

What are your RQD and UCS vales like? If it’s highly weathered and UCS <0.6MPa you should treat it as a soil. P-y curves are appropriate.

RE: Lateral Pile capacity in Rock

Please also recognize that RQD is only measured on rock that cannot be broken by hand. So, if you have a 12-in long piece of intact rock core and can break it by hand, the rock will have an RQD of zero, irrespective of the length of core pieces.

You may find some use of the RMR (rock mass rating) to assign shear strength. Bienieowski (sp) also has methods for modulus, or so I recall?

f-d

ípapß gordo ainÆt no madre flaca!

RE: Lateral Pile capacity in Rock

(OP)
The RQD values are 0 in the completely weathered rock region. and UCS values are less than 10 Mpa.
But how can i cross check my lateral capacity. As p-y curves were created by Software by many iterations, i want to compare by capacity for satisfaction purpose by both shear and deflection criteria. for that help is required.
see the core box photos.

RE: Lateral Pile capacity in Rock

You can assess your lateral capacity for the marine clay and rock layers using p-y curve methods. Using L Pile you need to choose what type of rock your in "strong" or "weak" rock, below 6.9MPa is weak.

As far as i know, Broms solutions are for cohesive and non-cohesive soils. I dont think he has a solution for rock?

RE: Lateral Pile capacity in Rock

(OP)
Yes i already did p-y curves. But any analytical method to cross verify the ultimate capacity, if available.

RE: Lateral Pile capacity in Rock

Try taking lateral bearing capacity equal to [0.33 to 0.67]*vertical bearing capacity, with a further reduction near the surface where the rock isn't confined. 0.33 for when RQD is zero and 0.67 for when RQD is high. See links below for some options on near-surface reduction. This is of course a rough method meant for order-of-magnitude checking.

This report is fairly recent and includes a literature survey that shows how slim the pickings are for rock lateral load methods. Only a couple that are specifically for rock and which are non-linear.
http://www.eng.auburn.edu/files/centers/hrc/930-42...

This document is more recent and has another rock p-y curve that wasn't included in the Auburn Uni report. You might be able to use it for a check calculation.
https://www.rocscience.com/help/rspile/pdf_files/t...

Note that the Lpile/Reese method gave best results when the parameters were back-calculated to match test measurements. Without a test pile, you can only hope for a lucky match so need to go with a conservative design. Lateral load testing should be specified for construction but it would be better to do a test pile during design. From the magnitude of the loads and that the structure is a balanced cantilever bridge, this seems like a major project that should make that investment for public safety and potentially economic design.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - How ESI is Helping Move New Medical Device Product to Market Quicker & More Cost Effic
Early Supplier Involvement has long been a strategy employed by manufacturers to produce innovative products. Now, it almost seems like a necessity. Because decisions made in the design phase can positively affect product quality and costs, this can help add value to OEM bottom lines. This white paper will discuss many facets of ESI, including why it’s so valuable today, what challenges limit the benefits of ESI, how cost is impacted, and more. Download Now
White Paper - Moving to a Driverless Future
This white paper describes what we see as the best practices to support a sustainable engineering process for autonomous vehicle design. It exposes how to use simulation and testing in common frameworks to enable design exploration, verification and validation for the development of autonomous cars at a system, software and full-vehicle level to drive a mature product development process for automated driving. Download Now
Research Report - How Engineers are Using Remote Access
Remote access enables engineers to work from anywhere provided they have an internet connection. We surveyed our audience of engineers, designers and product managers to learn how they use remote access within their organizations. We wanted to know which industries have adopted remote access, which software they are using, and what features matter most. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close