INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

high point vents/low point drains-frequency

high point vents/low point drains-frequency

high point vents/low point drains-frequency

(OP)
I am working on the piping design for a hot water heating system on a 7 story hospital. Coordination with other trades on this job has been a nightmare and has forced us to make some undesirable routing choices.
As the HWS/R loop makes its way around each floor to individual VAV's, there are a substantial amount of elevation changes. This naturally creates traps. ALL OVER THE PLACE. In some instances our piping comes over the top of the VAV's, in others, underneath the VAV's.

As I'm working to wrap up the design I'm going back to install high point vents and low point drains on each floor. My plan is to put a HPV at the highest point per floor and a LPD at the lowest point.

My question is how redundant should I be with placing vents and drains? Is it necessary to put a LPD everywhere there is a trap? Would I want to put a HPV at the highest point of every branch? Is it necessary to put them on both Supply and Return?

Any help would be greatly appreciated. I certainly do not pretend to be an expert in fluid dynamics.

Thanks in advance

RE: high point vents/low point drains-frequency

Quote:

As I'm working to wrap up the design.....My plan is to put a HPV at the highest point per floor and a LPD at the lowest point.

IMO, this can be an issue later because "...the traps all over the place.." and no way to know where the HPV or LPD are needed as the inadequate flow problem happened or the piping shutdown required for maintenance or cleaning.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

eBook - Efficient and Effective Production Support with 3D Printed Jigs and Fixtures
Jigs and fixtures offer manufacturers a reliable process for delivering accurate, high-quality outcomes, whether for a specific part or feature, or for consistency across multiples of parts. Although the methodologies and materials for producing jigs and fixtures have evolved beyond the conventional metal tooling of years past, their position as a manufacturing staple remains constant due to the benefits they offer. Download Now
Overcoming Cutting Tool Challenges in Aerospace Machining
Aerospace manufacturing has always been on the cutting edge, from materials to production techniques. However, these two aspects of aerospace machining can conflict, as manufacturers strive to maintain machining efficiency with new materials by using new methods and cutting tools. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close