INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Double Splicing Timber Piles

Double Splicing Timber Piles

Double Splicing Timber Piles

(OP)
Is it okay for 55 ft long timber pile have to have two splices? That is, top 15ft treated, middle 20ft also treated, lower 20 ft untreated. Will this reduce the pile capacity?

RE: Double Splicing Timber Piles

Two splices in one timber pile... doubt you will find any authoritative source that addresses that situation. Even one splice should be avoided when possible.

Is this someone's (wild) "scheme" to "save money" by using short available treated and untreated piling? If so, do a cost estimate the cost to furnish / install splices then (try to) drive the pieced-together-pile. Compare this cost with furnishing and driving appropriate full-length piling.

Will it reduce pile capacity? IMHO, if the pile survives being driven (a big "if"), then for point bearing piling, absolutely reduced capactity. This assumes the soils surrounding the pile are "poor" and lack lateral support for the piling... otherwise 55' long piling would not be needed; shorter friction piling would likely be adequate.

www.SlideRuleEra.net idea

RE: Double Splicing Timber Piles

What does this support? Sounds like the guy didn't have a supply of longer piles and you maybe got left over-cutoffs. Sounds bad, but for some installations it may be ok.

RE: Double Splicing Timber Piles

(OP)
The water table was 18 ft deep during site investigation (3 years ago)and the piles have been shipped (20ft treated, and rest untreated). Unfortunately the water table now is 30ft, so the purpose is to use the ordered material, with two spilces, if okay. The piles will support house, upper 20ft fill, underlying 20 ft peat, underlying 15ft of soft silt, underlying dense sand for pile end bearing. I am using timber pile 8-10 inch diameter, allowable pile load 25 kips.

RE: Double Splicing Timber Piles

That doesn't sound like an engineer designed pile. Sounds more like a surplus of 20-30 foot piles that the supplier told you it would work.

RE: Double Splicing Timber Piles

Geoman69 - You don't seem to want to take "no" for an answer. Why don't you try the two-splice "scheme" and see what happens. BTW, I not being sarcastic, the short piles are available, maybe it will work.

Edit: If the piles can be successfully "stood up" (without breaking at a splice), I would not to be nearby when driving is attempted... risk of flying debris.
www.SlideRuleEra.net idea

RE: Double Splicing Timber Piles

Sounds like settlement maybe expected as the site settles with lower ground water,among other factors.. What's your negative friction load as the peat compresses? As ground settles and building stays up, have some rat traps on hand for those living under the house.

RE: Double Splicing Timber Piles

Why use untreated pile for a residential foundation, stop and order the correct treated pile the correct length

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - How ESI is Helping Move New Medical Device Product to Market Quicker & More Cost Effic
Early Supplier Involvement has long been a strategy employed by manufacturers to produce innovative products. Now, it almost seems like a necessity. Because decisions made in the design phase can positively affect product quality and costs, this can help add value to OEM bottom lines. This white paper will discuss many facets of ESI, including why it’s so valuable today, what challenges limit the benefits of ESI, how cost is impacted, and more. Download Now
White Paper - Moving to a Driverless Future
This white paper describes what we see as the best practices to support a sustainable engineering process for autonomous vehicle design. It exposes how to use simulation and testing in common frameworks to enable design exploration, verification and validation for the development of autonomous cars at a system, software and full-vehicle level to drive a mature product development process for automated driving. Download Now
Research Report - How Engineers are Using Remote Access
Remote access enables engineers to work from anywhere provided they have an internet connection. We surveyed our audience of engineers, designers and product managers to learn how they use remote access within their organizations. We wanted to know which industries have adopted remote access, which software they are using, and what features matter most. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close