The water table was 18 ft deep during site investigation (3 years ago)and the piles have been shipped (20ft treated, and rest untreated). Unfortunately the water table now is 30ft, so the purpose is to use the ordered material, with two spilces, if okay. The piles will support house, upper 20ft fill, underlying 20 ft peat, underlying 15ft of soft silt, underlying dense sand for pile end bearing. I am using timber pile 8-10 inch diameter, allowable pile load 25 kips.