INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

WQT per ASME sec IX

WQT per ASME sec IX

WQT per ASME sec IX

(OP)
Respected experts!

please give your kind opinion on following matter:

I want to run a WQT as per ASME IX, what is the acceptance criteria for a WQT with reference.
As per my understanding to qualify a WQT both options from following must be satisfied per QW 304.1:

a) Visual acceptance
b) Mechanical or volumetric testing

But what will be the acceptance criteria for visual per ASME IX. as QW 304.1 do not refer any clause for visual acceptance criteria. will it be QW 194?

RE: WQT per ASME sec IX

Table QW-452.1(a) shows testing required. Leads to QW-302.4 which leads to QW-194.

RE: WQT per ASME sec IX

(OP)
Thank very much David!

RE: WQT per ASME sec IX

I think what Faree is looking for in Visual Inspection is what the root and cap should 'look' like to be acceptable before it is sent to be tested,such as a uniform crown throughout the weld, no undercut and no visual lack of fill, no surface porosity, no surface slag, no arc strikes. The root should be uniform also throughout the weld. No more than 3/32' in height and no more than 3/32' in concavity. No excessive penetration & no under cut. No burn thru with a repair etc. These VT inspections should be stated in a job welding test shop specification and does not have to be as I indicated. They should be discussed with the welder before the start of the test to let him know what is required of him. Remember that different contractors, different test shop inspectors might require different things to be acceptable in your test coupon. I do not think the code address these things.

RE: WQT per ASME sec IX

Sorry folks, but the visual acceptance criteria of Section IX is very sparse.

QW-194 Visual Examination — Performance
Performance test coupons shall show complete joint
penetration with complete fusion of weld metal and base
metal.

While it isn't strictly in accordance with Section IX, I ask the contractor what construction code applies to the bulk of their work. I typically apply that visual acceptance criteria to the performance test. My justification is that it makes little sense to qualify a welder to the visual requirements of Section IX, send him or her to the job site and then discover they can't meet the job requirements. I list the construction code and in the case of B31.3, the fluid service class on the welder performance test report under the heading of visual examination. It does weed the skilled from the unskilled, but it saves the contractor time and money in the long run. However, to restate this practice is only with the agreement of the contractor. The welder is provided with a written copy of the visual criteria and WPS (supplied by the contractor) before welding starts.

Not everyone agrees with this approach. They take the position there is no prohibition against the use of the grinder to dress the completed weld or excessive melt-through as long as the sample passes the bend test or RT. In my opinion is that puts a welder with marginal skills on the job. That can be an expensive proposition for the employer.

Best regards - Al

RE: WQT per ASME sec IX

Agree 100% with your comments Al.
Whether we are employed directly by the contractor, employed directly by the client or employed as a third-party our role is to ensure we are signing off on competent welders.
I value my reputation and my integrity so I will not sign off on something that looks like "a dogs breakfast" even though it may comply with the ASME IX code.
As you have stated previously as long as the welders are aware of the test requirements before they start the test there should be no problem.
Cheers,
Shane

RE: WQT per ASME sec IX

When I am required to set up a 'Qualification Test Center'(Test Shop),I will always have the test shop supervisor explain to the welders what is required of them. I will also display weld samples of all the weld processes that we will be using in the field. These 'on display' weld samples are what is required to be visually acceptable for the weld test coupon and field welds. Of course these sample welds are visually 'awsome'

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources

White Paper – Your Construction ERP RFP Checklist
Selecting business software for a medium to enterprise-sized construction concern is extremely challenging in large part because most enterprise resource planning (ERP) suites originated in the world of repetitive manufacturing and are therefore a poor fit for a project and asset-centric business. However, midsize to large contractors need the predictable, auditable processes that ERP delivers. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close