INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

What is the process of waterproofing membrane application

What is the process of waterproofing membrane application

What is the process of waterproofing membrane application

(OP)
HI

I am just new on construction and i don't have Engr to help me I am asking here if anyone knows the process for waterproofing membrane application?

the process so far ive known is

Slab
primer waterproofing coating
waterproofing membrane
and after this since I have to put the concrete topping on the membrane do I need to put reinforcing material above the membrane or does the topping concrete will stick on the membrane without the reinforcing material?

Thank you
Enen

RE: What is the process of waterproofing membrane application

If putting concrete over it, I would use a 1/2" protection board... Have to determine if you want your membrane mechannically fastened or adhered and the type of material... I swear by EPDM for most single ply applications.

Dik

RE: What is the process of waterproofing membrane application

(OP)
Hi Dik,

Thank you for your reply. DO you have in mind what would be the best product that we could cover the membrane?

Thank you
Enen

RE: What is the process of waterproofing membrane application

Depending on the type of waterproofing membrane, one of the most important steps is surface preparation before the primer is applied. Make sure there is no dust or debris or moisture or other bond inhibiting materials on the surface, then follow the waterproofing manufacturers surface prep instructions.

RE: What is the process of waterproofing membrane application

(OP)
Hi Canuck65,

Im using bostik torch membrane product, and my current surface is rough is this OK to directly apply the primer or should i prepare the surface to be smooth?

Thank you
enen

RE: What is the process of waterproofing membrane application

For any application, you should be following the manufacturer's specifications on the use of the material. If this is on fresh concrete, there may be specific requirements (e.g., application cannot be applied for X days from the pour to allow the concrete to cure).

RE: What is the process of waterproofing membrane application

waterproofing membrane can be at least 100 things... i guess i wonder how you ended up on this one.... is someone else driving the ship and then they dumped it on you to design around it? in usa, the waterproofing usually is the design responsibility of the architect and sometimes they have an envelope consultant involved. waterproofing gets its own spec and the manufacturer will have people who will help prepare a spec to install their product to include in your contract documents. they will also review your details and give you feedback. the manufacturer of waterproofing has standard details. in general you want to stick to them and the instructions or they will have reason to explain why the warranty is invalid and you look like you're experimenting ideas out with someone else's property.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - How ESI is Helping Move New Medical Device Product to Market Quicker & More Cost Effic
Early Supplier Involvement has long been a strategy employed by manufacturers to produce innovative products. Now, it almost seems like a necessity. Because decisions made in the design phase can positively affect product quality and costs, this can help add value to OEM bottom lines. This white paper will discuss many facets of ESI, including why it’s so valuable today, what challenges limit the benefits of ESI, how cost is impacted, and more. Download Now
White Paper - Moving to a Driverless Future
This white paper describes what we see as the best practices to support a sustainable engineering process for autonomous vehicle design. It exposes how to use simulation and testing in common frameworks to enable design exploration, verification and validation for the development of autonomous cars at a system, software and full-vehicle level to drive a mature product development process for automated driving. Download Now
Research Report - How Engineers are Using Remote Access
Remote access enables engineers to work from anywhere provided they have an internet connection. We surveyed our audience of engineers, designers and product managers to learn how they use remote access within their organizations. We wanted to know which industries have adopted remote access, which software they are using, and what features matter most. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close