INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

API 650 carbon steel storage tank cost estimation

API 650 carbon steel storage tank cost estimation

API 650 carbon steel storage tank cost estimation

(OP)
Dear everyone

is there any procedure to make the necessary cost estimation for a fixed roof storage tank which must be fabricated according to API 650.
what we need is an approximate values for:
1- foundation
2- erection and construction
3- how many tons of carbon steel plates needed taking into consideration that the diameter of the tank is 25 m and 6 m hight

many thanx in advance

RE: API 650 carbon steel storage tank cost estimation

Put together an API 650 Tank Data Sheet, send it to several tank companies, wait for responses.

Or, put together an API 650 Tank Data Sheet, send it to an engineer or engineering firm, pay them to do a basic tank design and make one drawing with enough information for tank companies to bid that tank ( allowing for alternates, etc, but make them bid THAT tank ), send that to tank companies and wait for responses.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - Addressing Tooling and Casting Requirements at the Design Stage
Several of the tooling and casting requirements of a part can be addressed at the design stage. If these requirements are not addressed at the design stage, lot of time is spent in design iteration when the design reaches the die caster. These design issues lead to increase in time and cost of production leading to delay in time to market and reduced profits for the organization. Download Now
White Paper - The Other Side of Design for Assembly
Assembly level constraints need to be satisfied before the design can move downstream. This white paper will go through the various assembly level issues, which need to be tackled by various organizations on a regular basis. Know more about DFMPro, a design for assembly software. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close