INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PE Stamping P&IDs

PE Stamping P&IDs

PE Stamping P&IDs

(OP)
Can someone please direct me to the source of the legal requirement to PE stamp P&IDs in Texas?

If stamping is required, what engineer/discipline is required to PE stamp the P&IDs? Where is the legal regulation for this requirement?

Thanks.

RE: PE Stamping P&IDs

Who have you asked within your own company? What does your customer require in previous bids/contracts/proposals?

Where have you looked already?

RE: PE Stamping P&IDs

https://engage.aiche.org/communities/community-hom...

Throughout my 30+ year career, I have worked in the Fiber, Chemical and Pharmaceutical industries. Most of the time, I have been a Senior Process Engineer for A&E firms. For the first time this past year, I was asked to use my PE stamp to seal Process and Instrument Drawings (P&IDs). At the request of my company, I have registered with NCEES and have obtained PE licensure in 3 states. Companies that process hazardous chemicals are required by federal law to keep their P&IDs current and have a management of change program in place. It just makes sense to me that A&E firms should be PE stamping their new or modified P&IDs although it is not explicitly required in all states.

I believe that the engineering profession is becoming a victim of poorly written and vague laws ...

In an absurd era where states mandate "all PIDs" must be sealed by a PE, clients,consultants an will require PE stamps on Utility PIDS

MJCronin
Sr. Process Engineer

RE: PE Stamping P&IDs

Engineering Practice Law

If the law is strictly interpreted, all engineering work is required to be stamped because the work consists of the practice of engineering as defined in the law. Read the law, as it is linked above, Section 1001.003. Practice of Engineering.

The law generally allows you to stamp only the work where you are in responsible charge and only for work in your particular discipline. For example, you can't stamp electrical work if you are a mechanical engineer.

However, there is no enforcement mechanism that ensures engineering work is stamped. So what happens is that a lot of engineering work is never stamped.

Engineering work that is submitted to the government for review or permit is stamped. That is because the government agency where the engineering work is submitted specifically requires the work to be stamped and the agency will verify stamping. Usually the particular agency lists the requirement that the work be stamped.

Under the Texas Engineering Practice Act, only duly licensed persons may legally perform, or offer to perform engineering services.

Don't understand why, but many engineers have some kind of libertarian mindset and seem to resent the requirement for licensing. If you are one of these, feel free to respond to the OP, but don't respond to me.

RE: PE Stamping P&IDs

(OP)
I think you all are correct that the Texas law as written states that all final engineering documents are to be stamped. But, I have never seen P&IDs stamped.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper – Choosing the Right Spring Loaded Connector
In today’s cost-sensitive world, designers are often driven to specify the lowest cost solution for every aspect of their designs to ensure that their solution is competitively priced and their company remains profitable. However, specifying a low-cost, low-quality connector solution can result in premature failure, considerable re-work costs and damage to reputations. Download Now
eBook – Own the Lifecycle: Sustainable Business Transformation
Increasingly, product and services companies are seeking more information and control in the operational lifecycle of their products, including service and use. Better information about the operational lifecycle, and the ability to use that information, requires more than just unstructured data flowing back from products in the field. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close