×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Narrow Trench Pavement Replacement

Narrow Trench Pavement Replacement

Narrow Trench Pavement Replacement

(OP)
I've got a project that requires installing about 160-ft of 3/4" gas line across a heavy vehicle maintenance yard (thick section 8" PCC, #4 12" OCEW).

The gas line will be a 2-ft bury, and I am considering the minimum width of trench for saw cutting and replacement of the paving.

Many details I've found recommend a 4-ft minimum width, with 1-ft overlap each side of the trench. I think this increased width is to have the replacement concrete act as a panel.

As a value engineering, would anyone recommend a 2-ft wide trench cut. I wonder if practically they could drill in dowels to the adjacent concrete (#4@12" O.C.) with such a narrow trench? I think compacted 3/4" gravel as trench backfill and subgrade would be appropriate rather than flowable fill.

Any thoughts?

RE: Narrow Trench Pavement Replacement

I'd go wider, maybe 4 feet and limit trench bottom width, depending on excavator available. I'd want sloping sides of the trench so there is less chance of losing support for adjacent slabs. Of course it depends on subgrade material. In running sand, maybe go even wider. If a narrow trencher is used, there still is a good chance the sides will be loose, so sloping sides would be better.

RE: Narrow Trench Pavement Replacement

I would look into directional drilling/boring and avoid open cut completely.

RE: Narrow Trench Pavement Replacement

this is typically a "T" type trench. your trench can be any width that is constructable with your soil conditions and your equipment, preferably as narrow as possible, but pavement repair is usually wider.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

eBook - Rethink Your PLM
A lot has changed since the 90s. You don't surf the Web using dial-up anymore, so why are you still using a legacy PLM solution that's blocking your ability to innovate? To develop and launch products today, you need a flexible, cloud-based PLM, not a solution that's stuck in the past. Download Now
White Paper - Using Virtualization for IVI and AUTOSAR Consolidation on an ECU
Current approaches used to tackle the complexities of a vehicle’s electrical and electronics (E/E) architecture are both cost prohibitive and lacking in performance. Utilizing virtualization in automotive software architecture provides a better approach. This can be achieved by encapsulating different heterogeneous automotive platforms inside virtual machines running on the same hardware. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close