INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

FPE USD relay testing

FPE USD relay testing

FPE USD relay testing

(OP)
Hello,
Calling on maintenance specialists:
My electrical maintenance contractor is recommending replacement of several trip units on our 600V ACBs due to unavailability of the test set for this relay. I asked him if he had exhausted all sources like the used market or rental and he said yes. Does this seem reasonable to replace all these trip units (10) at considerable cost, or should I find a contractor who has the necessary test set?
Thanks,
S.

RE: FPE USD relay testing

You don't need it, just do primary injection. Secondary injection testing alone doe snot meet the NETA/ANSI test requirements anyways.

RE: FPE USD relay testing

(OP)
Isn't primary injection a big deal to set up? Are all maintenance contractors able to do this? I'm in Canada and I'm not sure whether ANSI applies here, but if you can point me to any references on the subject I'd appreciate it!
Cheers,
S.

RE: FPE USD relay testing

Only maintenance contractors that know what they are doing lol. There are plenty of NETA certified companies in Canada able to do that for you.

RE: FPE USD relay testing

To test these trip units only one current source in needed. But knowing on what breakers these are found, you better replace the whole breaker than just the T/U.

RE: FPE USD relay testing

(OP)
I've heard those breakers are not the best LOL. If we were sure the building is going to be kept long term, I agree with you it would be a no brainer to change out breakers.

BTW, I found a different contractor that can test those T/Us... so I'm good for the interim.

Thanks all.

RE: FPE USD relay testing

There is nothing wrong with those breakers, Federal Pacific gets a bad rap from some issues with their residential breakers in the 80's but their LVPCB's have no real issues.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - Implementing a Multi-Domain System
IoT systems are multi-domain designs that often require AMS, Digital, RF, photonics and MEMS elements within the system. Tanner EDA provides an integrated, top-down design flow for IoT design that supports all these design domains. Learn more about key solutions that the Tanner design flow offers for successful IoT system design and verification. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close