×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Does anyone have experience with MT

Does anyone have experience with MT

Does anyone have experience with MT

(OP)
Does anyone have experience with MTO (Ontario) contracts?
We are at a bit of stand off here with the interpretation of a contract that references a special provision that calls for a Quality Verification Engineer (QVE) signing a Certificate of Conformance (CofC) signing off on these precast culverts we are fabricating.
The issue is that every item of the MTO bid document that requires a CofC signed by a QVE, explicitly calls for it; whereas the culvert item only calls for Certificate of Conformance only but not signed by a QVE, furthermore, the other item sections define CofC as a document signed by a QVE, but the culvert item section does not contain that definition.
What the bid document says is in the General Special Provisions, at the begining of the document, it mentions that provision to have CofC signed by a QVE (199S48).
So I guess my question is if 199S48 applies to ALL the items on the bid (being in the General Specific Provisions and all) and the fact that they specifically mention the need of CofC signed by a QVE on some items only, is just a redundancy?

The temporal solution we've given to this is to proceed with CofC by QVE, because that is the safe thing to do.... better more than less, right? but I think it would be nice to save some money by sparing the use of the engineer, no?

Some input would be really appreciated

M.

RE: Does anyone have experience with MT

You need someone with contract administration experience. If the contract is ambiguous, case law is on your side and then you have a good chance of 'winning' your argument (not advocating that a legal route is correct... only part of your argument).

Dik

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - The Criticality of the E/E Architecture
Modern vehicles are highly sophisticated systems incorporating electrical, electronic, software and mechanical components. Mechanical systems are giving way to advanced software and electronic devices, driving automakers to innovate and differentiate their vehicles via the electric and electronic (E/E) architecture. As the pace of change accelerates, automotive companies need to evolve their development processes to deliver and maximize the value of these architectures. Download Now
White Paper - Model Based Engineering for Wire Harness Manufacturing
Modern cars, trucks, and other vehicles feature an ever-increasing number of sophisticated electrical and electronic features, placing a larger burden on the wiring harness that enables these new features. As complexity rises, current harness manufacturing methods are struggling to keep pace due to manual data exchanges and the inability to capture tribal knowledge. A model-based wire harness manufacturing engineering flow automates data exchange and captures tribal knowledge through design rules to help harness manufacturers improve harness quality and boost efficiency. Download Now
White Paper - Modeling and Optimizing Wire Harness Costs for Variation Complexity
This paper will focus on the quantification of the complexity related costs in harness variations in order to model them, allowing automated algorithms to optimize for these costs. A number of real world examples will be provided as well. Since no two businesses are alike, it is the aim of this paper to provide the foundational knowledge and methodology so the reader can assess their own business to model how variation complexity costs affect their business. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close