INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Concrete targets

Concrete targets

Concrete targets

(OP)
We are making a batch of concrete panels for some testing. It is outside of the range of what we normally do, and we are far from experts. The goal is a square 24" panel at 1.8" thick. We made some forms out of pine and plywood and had a local concrete place deliver a yard of 5000psi grout with a 4" slump. Typical 10ga remesh from a big box store was suspended about halfway through the thickness. We were concerned with using a mix with large aggregate because of the shallowness of the pour, and we were recommended to go with 5k grout by the concrete guys.

The temperature outside has been in the upper 20s and dry. We poured inside our shop space with the truck backed up to our open garage door. When the concrete truck started to dump, the batch looked like meatballs coming down the chute. They were hard clumps of cement and would crumble when squeezed. The truck driver added some water and churned the mix until it smoothed out, and we poured our panels.

Cracks began to form during the curing process. The cracks are strongly correlated with the lines of the remesh. The mix was pretty soupy and easy to pour, so I have some reason to believe that too much water was added in the truck. I suspect cure temperatures in the shop were never much below 45 and up to 60 shortly after we finished.

We are trying to decide whether we should simply chalk our experience up to too much water or do the next batch without the remesh. Also, we planned to leave the concrete in our forms for our testing, so we did not put any kind of release on them. Is it possible that the concrete sticking to the sides of the form caused it to crack as it cured and shrunk? Any thoughts would be appreciated as we try to decide what to do differently moving forward. Many thanks.

RE: Concrete targets


Some pictures of the cracks might help to elicit input from others on this forum.

How was the mesh installed? Did you put down about 0.9" of grout, place the mesh, then cover it with the remaining grout needed to get to 1.8" thick?

The "meatballs" of cement are a concern - were they 100% cement with no sand in them?

Ralph
Structures Consulting
Northeast USA

RE: Concrete targets

Did you cure the concrete with wet burlap, plastic sheets or spray-on compound?

Check out Eng-Tips Forum's Policies here:
FAQ731-376: Eng-Tips.com Forum Policies

RE: Concrete targets

The NRMCA prepared an article on the topic named Cement Balls or Lumps in Freshly Mixed Concrete “Causes and Cures” I have attached it here. This will only solve part of the problem. I recommend you use a UHPC mix that has about 2% fibers. There are some commercial sources, ITW Engineered Polymers, Lafarge Ductal® and Steelike™ Concrete System. You could go even thinner with these systems.

Larry from Lehigh White Cement Company

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Solutions Brief - Protecting and Rescuing On-Ground Personnel
Keeping our warfighters safe and delivering them a competitive advantage is a key goal of departments of defense around the world. It’s a goal shared by embedded computing manufacturers like Abaco: we never forget who we serve.This case study describes how a major international contractor integrated an Abaco single board computer at the heart of its CAS/CSAR solution. Download Now
Datasheet - Top Enhancements Creo 7.0
PTC's Creo 7.0 has breakthrough innovations in the areas of generative design, real-time simulation, multibody design, additive manufacturing, and more! With Creo 7.0, you will be able to design the most innovative products faster than ever before, keeping you on the cutting edge of product design and ahead of your competition. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close