INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Do i need a structural engineers report to drill through 300ml reinforced concrete slab

Do i need a structural engineers report to drill through 300ml reinforced concrete slab

Do i need a structural engineers report to drill through 300ml reinforced concrete slab

(OP)
please can someone tell me if ineed to get a structural engineers report to core drill through a 300ml reinforced concrete slab - it needs to be 110ml wide? Thanks

RE: Do i need a structural engineers report to drill through 300ml reinforced concrete slab

4.5" hole through a 12" slab?

If the slab is PT, I would definitely consult a structural engineer prior to any drilling.

If the slab is CIP, probably not. Depends what the jurisdiction wants. However, I would still try to locate the reinforcing steel and miss it. Stay away from columns and the center of slab spans. Near the quarter of the spans would be a likely candidate area.

Mike McCann, PE, SE (WA)


RE: Do i need a structural engineers report to drill through 300ml reinforced concrete slab

Is it suspended?

mm = millimetre | ml = millilitre

RE: Do i need a structural engineers report to drill through 300ml reinforced concrete slab

(OP)
sorry millimetre - no it's not suspended - what is the difference between pt and cip - I'm researching this for someone else? Thanks for your responses.

RE: Do i need a structural engineers report to drill through 300ml reinforced concrete slab

Post Tensioned as opposed to Cast In Place.

Are you a structural engineer?

Mike McCann, PE, SE (WA)


RE: Do i need a structural engineers report to drill through 300ml reinforced concrete slab

In addition to determining whether the slab is post-tensioned or reinforced with mild reinforcing what is the location of the proposed core drill in relation to the columns below? If you are core drilling within the critical shear perimeter of a column you are reducing the punching shear capacity and this should be reviewed by an engineer prior to drilling.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - A Guide to 3D Printing Materials
When it comes to using an FDM 3D printer effectively and efficiently, choosing the right material at the right time is essential. This 3D Printing Materials Guide will help give you and your team a basic understanding of some FDM 3D printing polymers and composites, their strengths and weaknesses, and when to use them. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close