Placement of Sign
Placement of Sign
(OP)
Hi guys,
I'm new here and a new graduate. I just got a job in Edmonton, Alberta, Canada.
There are two signs in which I am to place, a "50 km/h ahead" sign and a "50 km/h" speed limit sign. Now the distance I need between the 2 is the distance required for a car to decelerate from 80 km/h to 50 km/h. Does anyone know if there's a standard I could look this up, or what to look up? I'm having trouble finding any information relating to this matter. Thanks a lot.
I'm new here and a new graduate. I just got a job in Edmonton, Alberta, Canada.
There are two signs in which I am to place, a "50 km/h ahead" sign and a "50 km/h" speed limit sign. Now the distance I need between the 2 is the distance required for a car to decelerate from 80 km/h to 50 km/h. Does anyone know if there's a standard I could look this up, or what to look up? I'm having trouble finding any information relating to this matter. Thanks a lot.
RE: Placement of Sign
I'll bet three baseballs to your hockey puck there are.
good luck
RE: Placement of Sign
RE: Placement of Sign
RE: Placement of Sign
RE: Placement of Sign