×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

EN10204 3.1 Certification

EN10204 3.1 Certification

EN10204 3.1 Certification

(OP)
Is there any reason why a manufacturer with a plant in england and one in another country cannot complete the en10204 certification in the name of the plant in england which is the head office and main company. EN10204 uses the term organisation has responsibility which would imply this is possible, as long as traceable systems are in place like iso 9001 is there a reason why the item certificate must have the actual address of the manufacturing plant in the other country on it. Both companies use the same electronic system for traceability of raw materials and tests. It uses a generic test certificate program but this only has the UK address on the header of the material certificate. also the small manufacturing plant in the other country is a division of the uk company. Thanks in advance for any advise.
Thanks
MR

RE: EN10204 3.1 Certification

The reason could be that EN 10168, which governs the contents of EN 10204 inspection documents, stipulates that the name and address shown is that of the works where the product was manufactured.

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdoweb/

RE: EN10204 3.1 Certification

If your organisation i.e. both plants operate the same mangement system and procedures and if the system is managed by the same quality management team under one system registration (global registration). Also if within this system it is stated that person A at plant A is authorised to validate inspection documents for products produced at plant B you may just have a case and should talk to your management system notified body.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close