×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

PT slab on grade for slope creep

PT slab on grade for slope creep

PT slab on grade for slope creep

(OP)
Does anybody know if PT slab grade foundations are used to help mitigate the effects of slope creep ?  Slope creep is a phenomena which occurs on slopes constructed of expansive soils.  After several years of wetting and drying cycles the slope begins to creep downhill.  Slope creep eventually leads to a loss of the lateral and vertical support.

I've seen others recommend PT slabs to help mitigate against differential settlement (due different fill thicknesses below a foundation).

Seems like both conditions produce differential settlement, and therefore a PT slab would be effective to help reduce the effects of slope creep.  Any thoughts ?

Thanks


 

RE: PT slab on grade for slope creep

Prestressed or not, a slab extending beyound the building will cause the water content be more stable. If you combine this with diverting any surface waters coming from up the hill, you will have enhanced the suppor of your house locally, since less able to undergo the whole weather cycle on water contents of the soil. Being prestressed it is assumed impermeability will be bigger, so it is good.

This scheme will be defeated any time any permeable layer is embedded that furnishes waters to the unstable clays, but should work where the clayey nature is general. You may include cutoffs embedded in the soil, but then I suggest make them able to undergo structural action, and with your building firmly anchored to the soil, for otherwise you may be pre-cutting the piece to slide.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - PLM and ERP: Their Respective Roles in Modern Manufacturing
Leading manufacturers are aligning their people, processes, and tools from initial product ideation through to field service. They do so by providing access to product and enterprise data in the context of each person’s domain expertise. However, it can be complicated and costly to unite engineering with the factory and supply chain. Download Now
White Paper - Medical Device Design Control
Medical device product development is a highly integrated and regulated process. Implementation of a requirements tracking solution requires attention to a variety of nuanced topics. When presented with the task of tracking the many concept relationships in a project of this type, the initial software solution of choice tends to be a two-dimensional text systems. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close