Hello,
I apologize if this question was already asked on this forum, but is it a common(industry) practice to provide ground connection for Y-Y grounded PT's at the switchgear where the PT's are installed? If the secondary wiring(4-wire "Y") leaves the switchgear to control room, we should avoid grounding the the neutral again in the control room, correct?
Thanks,
EE
I apologize if this question was already asked on this forum, but is it a common(industry) practice to provide ground connection for Y-Y grounded PT's at the switchgear where the PT's are installed? If the secondary wiring(4-wire "Y") leaves the switchgear to control room, we should avoid grounding the the neutral again in the control room, correct?
Thanks,
EE