Here is something that I always wondered about...
In the Vulcraft Deck catalog, for a concrete slab poured over metal deck, they sometimes recommend WWF that are less than the minimum ACI requirement for slabs.
Do some engineers use less than the ACI minimum? How is this justified?
Can the area of the composite metal deck be used to meet the ACI minimum steel requirement? What about form deck?
In the Vulcraft Deck catalog, for a concrete slab poured over metal deck, they sometimes recommend WWF that are less than the minimum ACI requirement for slabs.
Do some engineers use less than the ACI minimum? How is this justified?
Can the area of the composite metal deck be used to meet the ACI minimum steel requirement? What about form deck?