This subject is similar to thread507-309829. I was starting to get questions specific to the connection detail I posted on the aforementioned thread and decided I should dedicate my situation to a new thread before the other one was further hijacked.
Now to explain the connection shown in the attachment.
The seat is a 2'-0" long WT7x45 and the column is a W8x48. The WT has a 1" bearing plate. It was designed and constructed as part of a crane runway capacity increase. The original crane was 20-tons and is still on the runway. The new crane added to the runway is 25-tons. Both cranes are class E.
The original runway girders were connected to the web of the columns with double angle bolted connections. The design for the capacity increase resulted in one end of each runway girder being supported by the WT seat and the other end supported by a new column. The WT seat has its flange fillet welded to each column flange tip. The runway girders are still connected to the column webs with double angles.
I'm currently evaluating the capacity of the structure after finding numerous deficiencies during an inspection. The deficiencies were mostly related to lack of maintenance and poor construction of the prior capacity increase. I'm investigating removing the double angle connection of the runway girder to the column web. I've just started evaluating the capacity of the seat. Ideally, I'd like to come up with a way to get rid of the seat and double angle connection and have the girders bear on the existing columns.
To throw another variable into the equation, the X-bracing was removed and re-connected to the WT seat as specified in the design for the capacity upgrade.
Now to explain the connection shown in the attachment.
The seat is a 2'-0" long WT7x45 and the column is a W8x48. The WT has a 1" bearing plate. It was designed and constructed as part of a crane runway capacity increase. The original crane was 20-tons and is still on the runway. The new crane added to the runway is 25-tons. Both cranes are class E.
The original runway girders were connected to the web of the columns with double angle bolted connections. The design for the capacity increase resulted in one end of each runway girder being supported by the WT seat and the other end supported by a new column. The WT seat has its flange fillet welded to each column flange tip. The runway girders are still connected to the column webs with double angles.
I'm currently evaluating the capacity of the structure after finding numerous deficiencies during an inspection. The deficiencies were mostly related to lack of maintenance and poor construction of the prior capacity increase. I'm investigating removing the double angle connection of the runway girder to the column web. I've just started evaluating the capacity of the seat. Ideally, I'd like to come up with a way to get rid of the seat and double angle connection and have the girders bear on the existing columns.
To throw another variable into the equation, the X-bracing was removed and re-connected to the WT seat as specified in the design for the capacity upgrade.