Eabrar
Mechanical
- Jul 31, 2003
- 59
HI
Please tell me the requirment of preheat, postheat and PWHT for surface buildup on a shaft of dia 115mm and material having 0.28% Cr.
Thnaks.
Please tell me the requirment of preheat, postheat and PWHT for surface buildup on a shaft of dia 115mm and material having 0.28% Cr.
Thnaks.