Sooo sorry guys,
I was sent to the fields for an emergency pipeline repair and only got out today.
We intend performing a sectional replacement and the way we've being doing this is by creating a by-pass arround the bad spot using hot tapping and line blocking techniques.
I was only hoping that u will be able to give me some new ideas in the industries. I have come across some great ideas from u all and I believe there could be something on this too.
Greg Akhibi
ABB Lumus Global