Primary Superheater lower bend (SA-213-T11) 2 1/2" X 0.220” was incorrectly weld repaired (weld metal build-up) using E7018-A1. Area welded was approximately 2" x 8" Long. Primary Superheater is in a very hot location of the boiler. Client is aware of the situation. Is this something that should be address immediately or can it wait until next scheduled outage.