graycreek
Civil/Environmental
- Jan 25, 2009
- 1
County is persuing the replacement of two 1926 old highway 40 bridges with federal funding assistance cost est. of 10.6 million.The road past the bridges is a dead end and has very little traffic. ADT estimated at 10. The bridges have been reduced to one lane due to poor structural conditions for past 8 years.The replacement design is a two lane 28' wide bridge. Considering the road ends just past the bridges and there is no or very little increase of traffic projected in the future it seems that replacing the bridge with any more than one lane is inapropiate and a waste of tax payer's dollars.The County states that in order to qualify for the federal assistance funding that they must design with two lanes to meet federal specs. Does anyone know how federal funding could be obtained without meeting the federal spec. requirements? For example building one lane bridges instead of two.