Hi,All
I am reading ASTM standard of plate load test (ASTM D1194-94) in which the estimated total load is divided into at least ten steps and the time interval between two load increment is no less than 15 min.
My question is what is the purpose to divide the total load into several steps instead of continuous loading? Is it to simulate the staged construction of superstructure?
Thank you.