Load test (vertical & lateral) is to be carried out on same pile. Contractor wants to do the lateral load test first and then after a month will carry out vertical load test on the same pile.
Please suggest me whether this will provide a correct picture on vertical compression capacity since due to lateral load test around 4-5D of the surrounding soil will be disturbed and side friction may not generate.
How much time it will take for soil (clayey silt) to come back to its original position and regain its strength (thixotropic action).
Or do we suggest to perform the vertical load test first and then go for lateral load test.
Please suggest me whether this will provide a correct picture on vertical compression capacity since due to lateral load test around 4-5D of the surrounding soil will be disturbed and side friction may not generate.
How much time it will take for soil (clayey silt) to come back to its original position and regain its strength (thixotropic action).
Or do we suggest to perform the vertical load test first and then go for lateral load test.