fabengr
Structural
- Nov 29, 2009
- 30
I have a conflict between a CWI and myself regarding when the VT must be done on a weld that will be UT tested.
My point is that section 6.11 (this is to the D1.1:2000 because it is on a nuclear project) says that the "Welds subject to nondestructive testing shall have been found acceptable by visual inspection in accordance with 6.9." means that the VT testing HAS to be done before the NDE can be started.
I am saying that the words "shall have been found" means the VT is done first.
The CWI is saying that the VT just has to be done before the weld can be completely accepted.
Comments?
My point is that section 6.11 (this is to the D1.1:2000 because it is on a nuclear project) says that the "Welds subject to nondestructive testing shall have been found acceptable by visual inspection in accordance with 6.9." means that the VT testing HAS to be done before the NDE can be started.
I am saying that the words "shall have been found" means the VT is done first.
The CWI is saying that the VT just has to be done before the weld can be completely accepted.
Comments?