gwynn
Structural
- Aug 26, 2007
- 233
After spending some time looking at a project and possible design methods (or remediation measures in terms of an existing structure), I can tell whether or not kingposting is the best option. I was wondering if anyone knew of some rough guidelines as to when to look at this first. I can generalise and say that kingposting is only attractive when live loads are much greater than dead loads, but I haven't been able to develop anything more concrete than that.