Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

When is an MOC required. 1

Status
Not open for further replies.

Lance Pearson

Petroleum
Joined
Apr 17, 2024
Messages
2
Location
US
If you add in a set of welded flanges in a run of pipe.
The spec allows for flanges and flanges are already in the system, do you need to do an MOC?
No change in the P&ID.
 
Installing more flanges in an already flanged system, encreases the potencial for leaking so the risk of injuries, so IMO the need of a MOC.
 
Also a flange change the Hazardous area classification compared to a welded pipe.

So yes MOC required to look at all the consequences.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.
 
To add a final $0.02, yes, this requires an MoC. Given this is the petroleum forum, your area may fall under LDAR regulations. In such a case, the addition of a flanged connection may require adding that location to your required LDAR checks. You may or may not know this. However, a good MoC system would include an EHS professional, who should, if competent, catch anything that is overlooked by the submitter (like LDAR considerations).

That's the purpose of an MoC, and why is it is required even for something as "little" as adding a flanged connection in piping.
 
Its your engineering system (and MOC system). You should ask a colleague not some random dude.

--- Best regards, Morten Andersen
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top