what is the maximum displacement required for the structure..?

Status
Not open for further replies.

kamagi

Civil/Environmental
Joined
Jun 13, 2011
Messages
3
Location
TZ
if there is any ground motion. what is the maximum displacement for the structure is required?
 
What structure?
What useage?
What material?

Do you mean required, or allowable?

Mike McCann
MMC Engineering
Motto: KISS
Motivation: Don't ask
 
i mean allowable.. material is the concrete.
 
is there any provision in IBC or ASCE that response spectrum analysis deflection/drift criteria is different from equivalent static method?
 
kamagi,

depends on your local code.

What is the source of the ground movement?
 
Do you mean lateral story drift?
 