Hi, I am a British Engineer.
I was wondering if any of you could tell me what the American code is for the design, and manufacture of a 4 leg lifting sling ?
i.e. the ropes e.t.c. that a crane requires to lift a heavy object.
I was wondering if any of you could tell me what the American code is for the design, and manufacture of a 4 leg lifting sling ?