Busy Bill..
Tell us the tank diameter, total length, material of construction and code of construction.
The removal of the tank segments from the transport device, lifting,rigging and placement must be considered in an overall scheme.
In large projects, a single large tank is frequently broken into smaller volumes to suit transportation/ installation requirements.