Does a change of occupancy alone require a building to be upgraded completely to the new code requirements? I have a building that is going from residential to commercial. I can see that the floor live load will need to be increased but what about shear walls. Do they all have to be brought into existing compliance as well? To replace all of the mud sill washers seems like the biggest pain at this point. Not to mention that the existing anchor bolt spacing surely won't meet the calcs. once I complete them.
I have another commercial building where they moved a door over so there is technically the same length of shear wall. I made them bring that wall into compliance with new hold downs and the like but wish I could give folks a break sometimes if the code would allow.
I should mention that I am in California.
Thanks,
Garrett
I have another commercial building where they moved a door over so there is technically the same length of shear wall. I made them bring that wall into compliance with new hold downs and the like but wish I could give folks a break sometimes if the code would allow.
I should mention that I am in California.