Hey guys. I hope everybody are fine.
Are there any recommended practise or standard code that establish how long can wait my boiler and pipes from finished steam or air blowing to start-up without preservation?
 
Check manufacturer's manual

DHURJATI SEN
Kolkata, India

 
I think that for some reason after steam and air blowing after purgint it if you cannot start up with your boiler the best is to pressurize it with nitrogen under a positive pressure.

luis
 