btv189
Civil/Environmental
- Aug 9, 2013
- 7
During a recent concrete pour we did not wet the mud mat prior to the placement of concrete. The temperature outside was below freezing putting us in cold weather concreting. My question is what effect does this have on the slab itself? I believe its minimal due to the outside temperature and the humidity. ACI 318 or 306R does not include this as part of their preparation prior to concreting, 301 calls this out but does not identify whether this should be done in cold weather.