I am a consultant for steel structure, but I had a request, so I would like to understand the matter for the future, I do not want to be an "immediate" expert (apologize for tech wording not correct).
Oleodynamic installation max working pressure 300 atm (approx 300 kg/cm2). Pipe ID 280 mm OD 343 mm (that is wall thickness 31.5 mm) material S355 according to EN 10025
Girth welding : which is the best material preparation (that is butt, V, double V, etc
Welding procedure : pre-heating, controlled cooling, how many layers, etc
welding material : ???
ref. standards : ASME BPVC, etc
PS : as I said I would like to be "suggested/advised" in few main points so that I can go into thoroughly
Thanks for any help
Oleodynamic installation max working pressure 300 atm (approx 300 kg/cm2). Pipe ID 280 mm OD 343 mm (that is wall thickness 31.5 mm) material S355 according to EN 10025
Girth welding : which is the best material preparation (that is butt, V, double V, etc
Welding procedure : pre-heating, controlled cooling, how many layers, etc
welding material : ???
ref. standards : ASME BPVC, etc
PS : as I said I would like to be "suggested/advised" in few main points so that I can go into thoroughly
Thanks for any help