Eng-Tips is the largest forum for Engineering Professionals on the Internet.

Members share and learn making Eng-Tips Forums the best source of engineering information on the Internet!

  • Congratulations JStephen on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

WELDING DRAWING - problems with dims, leaders etc

  • Thread starter Thread starter Pave
  • Start date Start date
Status
Not open for further replies.
P

Pave

Guest
Dear Colleagues,
as you can notice from the picture, I have numerous problems with dimensioning welding in drawings. I use WF4, metric dimensioning. Decimal places are set to 0, lead_trail_zeros are set to std_metric.


2008-10-09_065046_Intermittent_weld_-_decimal_and_rest.JPG


I would stress three of my problems:

1) Is it a bug in Pro/E, or it is impossible to control decimal places? Somehow I always get four of them, though I set it to zero...

2) Is it possible to control the length of the leader in order to find enough space for the data? Best solution would be to have different leader lengths 4 different welds, on the same drawing...is it possible?

3) Is there a way to rearrange digits above leader (in my case "a4z6") in order to get coherent and neat dimensioning? Because, as you can see, digits and symbols are mixed and covering each other.

Thanks and kind regards from sunny Croatia
Pave
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top