gte447f
Structural
- Dec 1, 2008
- 815
Anyone have any experience with welding the side laps on 1.5B roof deck? I have always specified screws, but specified welds this time around for aesthetics (the Arch didn't want to see any screws b/c the underside of the deck is exposed). This is now backfiring on me, because apparently it is nearly impossible to weld the 2 sheets together without burning through. I upsized the deck from 22 to 20 ga to try to mitigate this problem, but the welders still can't avoid the burn through. I have come across a few "references" that say burn through is to be expected or that it is the rule and not the exception, but I don't see how this burn through cannot undermine the strength of the weld, not to mention it looks pretty bad. If this is such an issue, why do all the metal deck manufacturers publish diaphragm strength data for welded sidelaps?