Added info, I usually run perf pipe a max 300' before it changes direction of slope... this varies and for residential const, I usually use 40' to 50'. For a large warehouse without lots of ground water, 300' is OK.
Laterals are the drain tiles connecting the perf pipes to the sump (or, free drainage).
I usually determine the number of sump pumps from the water condition and/or the size. If problem water, then I often use 2 for redundancy, even for a small area.
The longer the run, the deeper the trench excavation and you should keep this above the lowest point of discharge <<++G++>>.
The attached are part of my General Notes (now over 300k in size). They are modified for each project and, depending on the use, have been upgraded for [Imperial | Metric]
Good luck...
Dik