Dear fellows:
I had inherited an interesting problem from another technician: a system of 14 water cooled TRANE Axiom 5-ton AHU, many of which trip on system starting. The sequence of the problem goes as follows: Water pump starts, flow established, 10 minutes later cooling tower No. 1 starts, 5 minutes later cooling tower No. 2 starts, then the AXIOM units begin to come on line at 1 minute intervals, some of them keep working, but most of them tripping the lockout relay. I had to reset them once, sometimes twice, and they keep running normally. Interesting is the fact that this behavior occurs mostly on saturday´s afternoons, when the system is switched on after a week long rest. I had all the water filters cleaned, and the problem remains.
Any clue?
Thank you!!
I had inherited an interesting problem from another technician: a system of 14 water cooled TRANE Axiom 5-ton AHU, many of which trip on system starting. The sequence of the problem goes as follows: Water pump starts, flow established, 10 minutes later cooling tower No. 1 starts, 5 minutes later cooling tower No. 2 starts, then the AXIOM units begin to come on line at 1 minute intervals, some of them keep working, but most of them tripping the lockout relay. I had to reset them once, sometimes twice, and they keep running normally. Interesting is the fact that this behavior occurs mostly on saturday´s afternoons, when the system is switched on after a week long rest. I had all the water filters cleaned, and the problem remains.
Any clue?
Thank you!!