HSIII
Structural
- Nov 23, 2010
- 86
Hey all,
A client of mine is going to have sheet piles placed close to (200' to 300' away from) his commercial structure. He wants a vibration assessment done on the structure. I have a fairly recent (3 years old) geotechnical report of the site soil conditions. In your opinion, should anything else go into consideration besides age of structure, type of structure, and overall general condition. Also, how would those weigh into "factoring" the typical peak particle velocity in this area (typical peak particle velocities in this area are usually assumed to be 0.04 in/sec for blasting/short impact and 0.2 in/sec for vibratory/hydraulic hammer type operations)?
Thanks in advance.
A client of mine is going to have sheet piles placed close to (200' to 300' away from) his commercial structure. He wants a vibration assessment done on the structure. I have a fairly recent (3 years old) geotechnical report of the site soil conditions. In your opinion, should anything else go into consideration besides age of structure, type of structure, and overall general condition. Also, how would those weigh into "factoring" the typical peak particle velocity in this area (typical peak particle velocities in this area are usually assumed to be 0.04 in/sec for blasting/short impact and 0.2 in/sec for vibratory/hydraulic hammer type operations)?
Thanks in advance.