Hello frnds,
I am a process engineer in a cement plant. we have a coal feeding system consist of the coal hopper,venturi, blower air & Burner.
Thare is a fluactuation in the coal feeding so that the operation is going disturbed.The one of the reason for this is the Venturi design problem.
Plz anyone can help me in making a new ventur design.